Welcome to Delhi Metro


Bangalore Metro Phase -1

Phase I spans a length of 42.3km and consists of 2 lines:

Line Elevated Length (km) Underground Length (km) Total Length (km) Stations
Purple Line 13.22 4.88 18.10 17
Green Line 20.20 4 24.20 24
Total 33.42 8.88 42.30 41

Implementation of Phase I has been divided into 4 "reaches" and 2 underground sections. The schedule for completion of Phase I is as follows:

Reach Terminals Opening date
Reach-1 (east) Baiyyappanahalli M.G. Road 20 October 2011
Reach-2 (west) Mysore Road Magadi Road End of 2012
Underground Section (east to west) Minsk Square Magadi Road End of 2014
Reach-3 (north) Swastik Yeshwanthapura May 2013
Reach-3A (north) Yeshwanthapura Peenya Industrial Area May 2013
Reach-3B (north) Peenya Village Station Hesaraghatta Cross Station May 2013
Underground Section (north to south) Swastik K.R.Market (City Market) End of 2014
Reach-4 (south) K.R. Road R.V. Road December 2013
Reach-4A (south) R.V.Road Puttenahalli December 2013

In 2007, BMRCL announced that it would incorporate a northern extension (from Yeshwanthapura to Hesaraghatta Cross) and part of the southern extension (from RV Road to Puttenahalli) in Phase I, thus extending the length of Phase I network to about 42 km (26 mi), with 40 stations. The objective of this was to connect the metro to the Outer Ring Road at both ends, and also cover the industrial areas of Peenya in the north-west, thereby providing better connectivity and increasing ridership. In October 2008, the Government of Karnataka approved this extension, which would cost an additional INR1,592 crore (US$300.89 million).

The Green Line (Reach 3, 3A & 3B) was initially scheduled to be thrown open to the public by the end of 2012. However, according to the BMRCL, because of the time taken by the Indian Railways to approve to works at Swastik Station and Malleswaram 66 metre metro viaduct, the Green Line is expected to open only in April-May 2013. Although Reach 3A may be completed earlier, operations on it cannot commence without the depot in Peenya.The remaining elevated sections of Purple Line (Reach 2) and Green Line (Reach 4) are scheduled to be completed by December 2012 and December 2013 respectively. They would be opened to the public only after the completion of the underground stretches of the network. The underground stretches will become operational by the end of 2014.

 


La estación Calle 23, de la nueva Línea Expo, fue bendecida

Posted by Jose Ubaldo on April 29, 2012 2:04 pm
El reverendo Kowalewski de la iglesia Episcopal bendice la estación de la calle 23. (Foto Luis Inzunza/El Pasajero). La congregación Episcopal de iglesia de St. John Cathedral visitó ayer la ...

Aglomeraciones y entusiasmo en Expo

Posted by Agustin Duran on April 29, 2012 9:58 am
Pronostican que la Línea Expo será una de las más ocupadas de todo el sistema de trenes Metro. (Foto Agustín Durán/El Pasajero). Unos viajaron al museo de Historia Natural, al Centro de ...

Ultimo día de recorridos gratis en la Línea Expo

Posted by Jose Ubaldo on April 29, 2012 9:28 am
Pasajeros desembarcando en la estación La Ciénega/Jefferson. (Foto José Ubaldo/El Pasajero). El día de ayer todo salió de maravillas y los números preliminares de personas que visitaron por ...

Hasta los muertos “con vida” se pasearon en la Línea Expo

Posted by Jose Ubaldo on April 29, 2012 8:58 am
Fotos y texto por Anna Chen Hasta los zombies disfrutaron de un recorrido por las nuevas instalaciones de la Línea Expo del Metro. Los zombies de Thrill the World Los Angeles no dejaron pasar la ...

Un vistazo a la Línea Expo esta mañana

Posted by Jose Ubaldo on April 28, 2012 3:12 pm
Hasta algunos gigantes estuvieron presentes en la estación Expo Park/USC. (Foto José Ubaldo/El Pasajero).   Un aspecto de la estación La Ciénega/Jefferson alrededor de la 1 de la tarde. ...

Los pasajeros de la nueva Línea Expo

Posted by Jose Ubaldo on April 28, 2012 2:57 pm
Angélica Escobar feliz de viajar en Metro rumbo al trabajo. (Foto José Ubaldo/El Pasajero).   La familia de un conductor de trenes de Metro esperan su llegada a la estación Expo/Western para ...

Fotografías de la inauguración de Expo

Posted by Jose Ubaldo on April 28, 2012 2:34 pm
Hunter, la mascota del Museo de Historia Natural. (Todas las fotos de Gary Leonard/El Pasajero).   El tren inaugural rompe el "listón/bandera" que marco la apertura de la Línea ...

Video: ceremonia de inauguración de la Línea Expo

Posted by Jose Ubaldo on April 27, 2012 5:53 pm

Desempolve su esmoquin; el día de viajar elegante en Metro es este domingo 29 de abril

Posted by Jose Ubaldo on April 27, 2012 5:37 pm
Haga clic aquí para ver vídeo ¿Usted ha deseado hacer un recorrido por los monumentos históricos de Los Ángeles en su vestuario más elegante? (¿Así como Stan Dapper, en el video de arriba?) ...

Se inaugura oficialmente la Línea Expo; mañana se abre al público

Posted by Maria Luisa Arredondo on April 27, 2012 3:27 pm
Momento culminante de la inauguración de la Línea Expo. Foto: Steve Hymon. Por Steve Hymon
Hoy por la tarde se llevó a cabo una ceremonia en Exposition Park para inaugurar oficialmente la ...

Firefly Bistro
Get 10% Off At Firefly Bistro

Edible Arrangements® and Frutation
Go Metro and save 10% on Frutation Products and $5 off any Edible Arrangement

Billy Elliot The Musical, April 11 – May 13
Go Metro and Save $15 on Select Tickets

ScoreBig
$25 off Sports, Concert and Theater Tickets

Get Fit with Witt!
Receive 50% off of two one-hour sessions

Vintage Encino
go Metro, take a tour and lunch is on us

Santa Monica Festival, May 19
Go Metro and Win a Free Bicycle

My Dream Closet Boutique
Go Metro and Save 10% on Purchase

Vintage Westwood Horizons
go Metro, take a tour and lunch is on us


View More Discounts





Create your metro travel
select source and destination station.





 

@metroLAalerts

 

 

RAIL

  • Metro Blue Line
  • Metro Expo Line
 

 

 





STAY CONNECTED: